Royal Ridge III: JLL
Irving, Texas

Case Studies
project scope
Royal Ridge III utilizes six chillers on a rooftop with a parapet wall. These walls restricted air flow to the chillers and caused them to trip offline in the heat. Being frequently driven to maximum head pressure was, in turn, burning up compressors.
peak+ solution results
By installing the PEAK+ system on all six chillers, the temperature of the air cooling the coils was reduced enough to keep the chillers from tripping offline. The building has not lost any compressors since installing PEAK+. Additionally their tenant, American Airlines, realized a 10% overall savings on their power bill.
