Private Data Center

The owner of a large data center facility with 3,310 Tons of air-cooled HVAC equipment had trouble losing compressors during peak temperature conditions. Additionally, their aging equipment was near the end of its useful life and the customer wanted to defer the large CAPEX expenditure required to replace all of their HVAC. The customer selected PEAK+ to ensure HVAC system reliability and to allow it to operate for additional years before a total HVAC system replacement.
Thanks to lower condenser air inlet temperatures, this customer went from losing upwards of nine compressors a year to losing zero compressors since installing PEAK+, resulting in fewer maintenance calls and a much lower maintenance cost.
Additionally, they experienced a 25% overall decrease in HVAC energy consumption bringing their PUE from 1.60 to 1.45 during the summer months. The resulting six figure annual cost savings went straight to the data center’s bottom line.